Developers and contractors

    Part L compliance for developers from £150 per plot

    Part L 2021 compliance for developers: design-stage and as-built SAP and SBEM calculations, air tightness and ventilation coordination, on-construction EPCs and building control sign-off evidence.
    Registered assessorsLodged on the EPC RegisterTypically within 24 hoursFixed, transparent pricing
    Housing development under construction with timber frames and site drawings
    AudiKiaGB NewsBudgens
    The short answer

    Part L of the Building Regulations sets the energy standard new and materially altered buildings must meet, and compliance is evidenced by calculations — SAP for dwellings, SBEM for non-domestic buildings — at both design stage and as-built. Team EPC produces both, coordinates air tightness and ventilation evidence, and issues the on-construction EPCs building control needs, for schemes from single plots to multi-phase developments across London and the Home Counties.

    020 3092 8551

    £150 per plot

    Starting price, all inclusive

    24hr

    Typical certificate turnaround

    4.9/5

    From 100+ reviews

    10 yrs

    EPC validity once lodged

    Reviewed by Awais Sarwar, MSc, accredited energy assessor and owner of Team EPCLast reviewed

    Standard

    Part L 2021

    England, dwellings and non-domestic buildings

    Guide price

    From £150 per plot

    Design-stage and as-built, quoted per scheme

    Evidence needed for sign-off

    As-built calculations

    Plus air tightness and ventilation records

    Certificates on completion

    On-construction EPC

    One per dwelling, before sale or letting

    Contract estimator

    Price a part l compliance instruction

    Move the sliders for an instant guide range. Send the address list and we confirm a fixed per-plot rate in writing, usually the same day.

    Guide range

    £725£850

    About £29£34 per residential plot. Excludes VAT, and moves with property size, access and distance from our Wembley base.

    020 3092 8551

    Guide figures only — nothing is booked and nothing is charged until you approve a written quote.

    Awais Sarwar, accredited energy assessor and owner of Team EPCAwais Sarwar out in a London park

    Who runs your contract

    Awais Sarwar, MScAccredited Energy Assessor

    Awais is an accredited domestic and commercial energy assessor and the owner of Team EPC. He has surveyed and lodged EPCs across flats, houses, HMOs, managed portfolios and commercial premises throughout London and the Home Counties.

    • Accredited domestic and commercial energy assessor, listed on the EPC Register
    • EPCs lodged across flats, houses, HMOs, managed portfolios and commercial premises
    • Also owns Fire Risk Specialists, so mixed-use buildings are handled under one roof

    What you get

    Everything included, nothing subcontracted.

    What is covered as standard on every part l compliance we carry out.

    Design stage first

    Compliance proved before you build, when changes are still cheap.

    As-built close-out

    Final calculations, EPCs and the evidence building control asks for.

    One consultant

    SAP, SBEM, air tightness and ventilation coordinated, not fragmented.

    Fix failures early

    Specification options modelled so a failing plot passes without redesign.

    What Part L actually requires of a development

    Part L 2021 tightened the standard significantly: dwellings must now demonstrate lower carbon emissions and primary energy use than the previous edition allowed, with fabric and ventilation standards to match, and non-domestic buildings face an equivalent tightening. Compliance is not a single certificate but a chain of evidence: a design-stage calculation showing the specification passes, a build that matches that specification, air tightness testing and ventilation commissioning results, and an as-built calculation confirming what was constructed still complies. Building control will not sign off without the as-built set, and no dwelling can be legally sold or let without its on-construction EPC.

    Design-stage calculations: where money is saved

    The cheapest time to solve a Part L problem is before anything is built. We take drawings, elevations, construction build-ups and the proposed heating and ventilation strategy, and model each dwelling type or the whole non-domestic building against the target. Where a plot fails, we model the routes back to compliance and price them in terms of buildability rather than handing over a bare fail: better glazing versus better walls, a change of heat source, more airtight detailing, adding photovoltaics. Getting that decision right at design stage regularly saves more than the fee across a site.

    • Every dwelling type or non-domestic zone modelled against the target
    • Failing plots given costed, buildable routes to compliance
    • Fabric, heating, ventilation and renewables options compared
    • A specification schedule the site team can actually build to

    As-built calculations, testing and sign-off

    Once the scheme is built, the calculations are re-run against what was actually installed — the boiler or heat pump that turned up, the glazing that was substituted, the insulation depths achieved — together with the measured air tightness results and the commissioned ventilation flow rates. That produces the as-built compliance evidence and the on-construction EPCs. Where substitutions have eroded the margin, we identify it and set out what recovers compliance, rather than discovering it at the point building control refuse to sign the building off.

    Air tightness and ventilation coordination

    Two things sink more Part L submissions than anything else: an air test result worse than the figure assumed in the design calculation, and ventilation that was never properly commissioned. Both are avoidable with sequencing. We advise on the air tightness figure to design to, coordinate the testing, and make sure ventilation commissioning records exist in the form the calculation and building control both need. Where a test comes back poor, we model what result is now required to keep the plot compliant and what specification change would achieve it.

    SAP for dwellings, SBEM for non-domestic, one point of contact

    Mixed schemes need both methodologies, and the interface between them is where things get missed — a residential block over commercial units, a converted building with new dwellings and retained non-domestic space, student accommodation with amenity floors. Running the SAP and SBEM work through the same consultant keeps the assumptions consistent, keeps the on-construction EPCs aligned with the compliance evidence, and gives you one person to call when building control raises a query rather than two firms pointing at each other.

    • New dwellings, conversions and extensions under SAP
    • Offices, retail, industrial and amenity space under SBEM
    • Mixed-use schemes assessed across both methodologies
    • On-construction EPCs issued from the same dataset

    Scope and price

    What it costs and how it runs.

    Indicative bands, confirmed as a fixed price before we book anything in.

    Indicative prices

    PropertyTypical scopePrice from
    Single plot or self-buildDesign-stage and as-built SAP plus EPCGuide £150–£300
    Small site, 2–10 plotsPer dwelling type modelling, as-built close-outGuide £120–£200 per plot
    Multi-plot developmentFull design-stage and as-built programmeQuoted per scheme
    Non-domestic building (SBEM)Design-stage and as-built calculations plus EPCGuide from £350
    Mixed-use schemeSAP and SBEM coordinated togetherQuoted per scheme
    Bands only — every building is priced on floors, units and complexity.

    From enquiry to report

    1. Design stage3–5 days

      Calculations on drawings, failing plots resolved before construction.

    2. SpecificationIssued with results

      A schedule the site team builds to, with the air tightness target set.

    3. TestingNear completion

      Air tightness and ventilation commissioning coordinated.

    4. As-built and EPCs3–5 days

      Final calculations, compliance evidence and on-construction EPCs.

    The difference

    Us versus a typical assessment.

    Plenty of certificates are produced in a rush, with no advice attached and an agency markup on top. Here is how we differ.
    Comparison between Team EPC and a typical commodity provider for Part L compliance
    AspectTeam EPCTypical assessment
    TimingDesign-stage modelling before you buildAs-built only, failures found too late
    Failing plotsCosted, buildable routes back to complianceA bare fail and a suggestion to add renewables
    ScopeSAP, SBEM, air tightness and ventilation coordinatedSplit across firms, gaps between them
    CertificatesOn-construction EPCs from the same datasetOrdered separately, inconsistent with the calculations
    Sign-off supportWe answer building control queries directlyReport issued, then unavailable

    How it works

    From enquiry to compliant.

    1. 01

      Quote

      Priced in minutes, online or over the phone.

    2. 02

      Book

      Survey slots within days, same-day and next-day available.

    3. 03

      Survey

      A registered energy assessor attends and surveys in person.

    4. 04

      Certificate

      Your EPC is lodged on the register, typically within 24 hours.

    Trusted by the teams we work for across London

    Audi
    Kia
    Car Giant
    GB News
    Budgens
    Pepe's Piri Piri
    Chicking
    Chaiwalla
    Zoomo
    Northwood
    Audi
    Kia
    Car Giant
    GB News
    Budgens
    Pepe's Piri Piri
    Chicking
    Chaiwalla
    Zoomo
    Northwood

    Frequently asked questions

    Book your part l compliance from £150 per plot.

    Tell us about the property and you will see a price in under a minute. Qualified registered assessors, certificate lodged typically within 24 hours of the survey.
    020 3092 8551

    No obligation. We answer the same day.

    Last word

    Ready when you are.

    Quote in 60 seconds. Assessor on site this week. Compliant report in your inbox within 24 hours. That's the whole process.

    020 3092 8551
    Transparent pricing No obligation 1,000+ assessments 100% compliance guarantee
    Awais Sarwar
    — Awais Sarwar, MSc
    MD · 4.9 Google
    4.9 rated
    ·100+ reviews·
    Direct provider
    Call