Completion and handover

    New build handover package Quoted per plot — one handover quote

    Everything a completed development needs at handover: as-built EPCs for every plot, communal fire risk assessment, alarm and emergency lighting commissioning evidence.
    Registered assessorsLodged on the EPC RegisterTypically within 24 hoursFixed, transparent pricing
    Awais Sarwar, Team EPC founder

    Awais & the Team EPC assessors

    London-based. Clear answers. Direct contact.

    4.9/5100+ reviews1,000+ EPCs completedRated 4.9 out of 5 from more than 100 reviews. More than 1,000 EPCs completed by registered energy assessors.

    • Registered energy assessors
    • Typical 24hr turnaround
    • £5M insured
    • 10+ years’ experience
    • Established 2014
    Newly completed apartment building ready for handover and occupation
    AudiKiaGB NewsBudgens
    Awais Sarwar enjoying cricket in a London park

    Your assessor, personally accountable

    Awais Sarwar, MSc — Accredited Energy Assessor

    Awais is an accredited domestic and commercial energy assessor and the owner of Team EPC. He has surveyed and lodged EPCs across flats, houses, HMOs, managed portfolios and commercial premises throughout London and the Home Counties, and is currently studying an MSc in philosophy alongside running the business.

    EPC Register
    Accredited assessor
    MSc
    Built environment
    MSc Philosophy
    Currently studying
    10+ years
    London property
    Fire Risk Specialists
    Sister brand, same owner

    Off the clock: cricket, family time, an MSc in philosophy in progress and finding London's best food.

    Awais Sarwar, accredited energy assessor

    Awais Sarwar

    Founder · Accredited energy assessor

    About Awais
    The short answer

    At handover a completed development needs an as-built EPC for every plot, a fire risk assessment for the common parts before occupation, commissioning and testing evidence for communal alarm and emergency lighting systems, and an electrical certificate set. The new build handover package delivers all of it in one coordinated sweep so plots can be released for sale or letting without waiting on the missing document nobody claimed ownership of.

    020 3092 8551

    Quoted per plot

    one handover quote

    24hr

    Typical certificate turnaround

    4.9/5

    From 100+ reviews

    10 yrs

    EPC validity once lodged

    Reviewed by Awais Sarwar, MSc, accredited energy assessor and owner of Team EPCLast reviewed

    EPCs

    One per plot

    From the as-built calculation

    Fire duty begins

    At occupation

    Not at agent handover

    Lodgement

    Within 48 hours

    Typical, per completed plot

    Pack format

    Indexed, per plot

    Gaps flagged rather than hidden

    Contract planner

    Plan a new build handover package instruction

    Set the size of the job and send it over. We review the address list and confirm a per-plot rate in writing, usually the same day.

    Reviewed pricing

    From £28 per EPC

    From £28 per residential EPC, subject to review and a confirmed quote. 25 residential plots.

    No rate is approved until we've reviewed the list.

    020 3092 8551

    Nothing is booked and nothing is charged until you approve a written quote.

    What you get

    Everything included, nothing subcontracted.

    What is covered as standard on every new build handover package we carry out.

    Plot by plot release

    EPCs issued as units complete so sales are not held up by a batch.

    Occupation-ready fire file

    Communal fire risk assessment in place before the first resident moves in.

    One sweep

    Energy, fire and electrical evidence gathered in a single coordinated attendance.

    Handover pack

    One indexed pack for the buyer, the managing agent or the freeholder.

    What handover compliance actually needs

    Four strands come together at practical completion. As-built energy calculations produce the EPC for each dwelling, and that certificate has to exist before the plot is marketed or let. The common parts need a fire risk assessment before occupation, because the duty under the Fire Safety Order starts the moment the building is occupied, not when the managing agent takes over. Communal fire alarm, emergency lighting and any smoke control installation need commissioning certificates and the beginning of a test log, not just an installer's invoice. And the electrical installation needs its certification set, with the distribution documented for whoever maintains it next. Missing any one of them stops the handover in practice even where it does not stop it in law.

    • As-built EPC lodged for every plot
    • Fire risk assessment for the common parts before occupation
    • Commissioning certificates for alarm, emergency lighting and smoke control
    • Test logbooks opened rather than left for the agent to start
    • Electrical certification set and distribution schedule
    • One indexed handover pack for the incoming manager

    Why handovers stall

    Not because the work was not done, but because nobody owned the evidence. The M&E contractor commissioned the alarm but the certificate sat in a site folder. The energy consultant produced as-built calculations but the EPCs were never lodged. The fire risk assessment was assumed to be the managing agent's job, and the managing agent assumed it came with the building. Then a solicitor asks for an EPC reference number on a plot exchanging in four days and the whole thing becomes urgent. Instructing the handover as one package puts a single name against the evidence, and gives you a checklist that shows what is outstanding while there is still time to fix it.

    What the package covers

    Team EPC produces the as-built calculations and EPCs, and Fire Risk Specialists covers the fire and electrical side, with one coordinator assembling the pack.

    • As-built SAP or SBEM calculations and EPC lodgement per plot
    • Communal fire risk assessment with a prioritised action plan
    • Alarm and emergency lighting testing and logbook set-up
    • Electrical condition and certification review
    • An index showing every plot and every document, with gaps flagged

    Sequencing against your programme

    We work to the completion programme rather than a fixed date. Plots are surveyed and lodged as they finish, so early phases release for sale while later ones are still being snagged. The communal fire risk assessment is timed to sit just before first occupation, since assessing an unfinished common part produces an assessment that is wrong by the time anyone lives there. Where the programme slips, the schedule moves with it — you get a revised sequence, not a cancellation charge.

    What it costs

    As-built calculations and EPCs are priced per plot, falling with plot count, and the non-domestic elements on floor area and zones. The communal fire risk assessment is priced on floors, cores and flats, and alarm and emergency lighting work on device and luminaire counts. The whole handover is quoted in writing against your plot schedule and drawings, and the bundle sits below instructing each element separately. Where we also ran the design-stage Part L work, the as-built stage is cheaper again because the models already exist.

    Scope and price

    What it costs and how it runs.

    Indicative bands, confirmed as a fixed price before we book anything in.

    Indicative prices

    PropertyTypical scopePrice from
    Per dwellingAs-built calculation and EPCQuoted per plot
    Non-domestic spaceAs-built SBEM and EPCQuoted on area and zones
    Common partsFire risk assessment elementQuoted per building
    Communal systemsAlarm, lighting and electrical evidenceQuoted on devices and circuits
    Bands only — every building is priced on floors, units and complexity.

    From enquiry to report

    1. Programme reviewWeek 1

      Plot schedule, completion dates and the evidence you already hold.

    2. Gap listWeek 1

      What exists, what is missing and who currently owns each item.

    3. Rolling completionPer phase

      Plots surveyed, calculated and lodged as they finish.

    4. Pre-occupation fire assessmentBefore occupation

      Common parts assessed just before the first resident moves in.

    5. Handover packAt completion

      One indexed pack issued to you, the buyer or the incoming manager.

    The difference

    Us versus a typical assessment.

    Plenty of certificates are produced in a rush, with no advice attached and an agency markup on top. Here is how we differ.
    Comparison between Team EPC and a typical commodity provider for New build handover package
    AspectTeam EPCTypical assessment
    Evidence ownershipOne named coordinator for the whole packSplit between four contractors
    Plot releaseEPCs lodged as plots completeBatched at the end
    Fire assessment timingJust before first occupationWeeks after residents move in
    Test logbooksOpened and handed over populatedLeft blank for the agent

    How it works

    From enquiry to compliant.

    1. 01

      Quote

      Priced in minutes, online or over the phone.

    2. 02

      Book

      Survey slots within days, same-day and next-day available.

    3. 03

      Survey

      A registered energy assessor attends and surveys in person.

    4. 04

      Certificate

      Your EPC is lodged on the register, typically within 24 hours.

    Trusted by the teams we work for across London

    Audi
    Kia
    Car Giant
    GB News
    Budgens
    Pepe's Piri Piri
    Chicking
    Chaiwalla
    Zoomo
    Northwood
    Audi
    Kia
    Car Giant
    GB News
    Budgens
    Pepe's Piri Piri
    Chicking
    Chaiwalla
    Zoomo
    Northwood

    Frequently asked questions

    More from us

    Related services.

    Areas we cover

    London-based and covering London, Hertfordshire, Middlesex and Berkshire.

    Book your new build handover package from Quoted per plot.

    Tell us about the property and you will see a price in under a minute. Qualified registered assessors, certificate lodged typically within 24 hours of the survey.
    020 3092 8551

    No obligation. We answer the same day.

    4.9100+ reviews1,000+ EPCs completedRated 4.9 out of 5 from more than 100 reviews. More than 1,000 EPCs completed by registered energy assessors.

    Call
    Last word

    Ready when you are.

    Quote in 60 seconds. Assessor on site this week. Compliant report in your inbox within 24 hours. That's the whole process.

    020 3092 8551
    Transparent pricing No obligation 1,000+ EPCs completed 100% compliance guarantee
    Awais Sarwar
    — Awais Sarwar, MSc
    MD · 4.9 Google
    4.9
    ·1,000+ EPCs completed·100+ reviews
    Call