Developers and contractors

    Developer Part L compliance package Quoted per plot — one project quote

    Part L 2021 compliance for developers in one package: design-stage SAP or SBEM, as-built calculations, air tightness coordination, and an EPC for every completed plot.
    Registered assessorsLodged on the EPC RegisterTypically within 24 hoursFixed, transparent pricing
    Awais Sarwar, Team EPC founder

    Awais & the Team EPC assessors

    London-based. Clear answers. Direct contact.

    4.9/5100+ reviews1,000+ EPCs completedRated 4.9 out of 5 from more than 100 reviews. More than 1,000 EPCs completed by registered energy assessors.

    • Registered energy assessors
    • Typical 24hr turnaround
    • £5M insured
    • 10+ years’ experience
    • Established 2014
    New housing development under construction with timber frames and site drawings
    AudiKiaGB NewsBudgens
    Awais Sarwar enjoying cricket in a London park

    Your assessor, personally accountable

    Awais Sarwar, MSc — Accredited Energy Assessor

    Awais is an accredited domestic and commercial energy assessor and the owner of Team EPC. He has surveyed and lodged EPCs across flats, houses, HMOs, managed portfolios and commercial premises throughout London and the Home Counties, and is currently studying an MSc in philosophy alongside running the business.

    EPC Register
    Accredited assessor
    MSc
    Built environment
    MSc Philosophy
    Currently studying
    10+ years
    London property
    Fire Risk Specialists
    Sister brand, same owner

    Off the clock: cricket, family time, an MSc in philosophy in progress and finding London's best food.

    Awais Sarwar, accredited energy assessor

    Awais Sarwar

    Founder · Accredited energy assessor

    About Awais
    The short answer

    A new build cannot be signed off or sold without Part L compliance evidence: design-stage SAP calculations for dwellings or SBEM for non-domestic space, an air tightness test result, as-built calculations reflecting what was actually constructed, and an EPC lodged for every plot. The developer Part L package delivers all of it under one instruction, with the design-stage work done early enough to change specification cheaply rather than late enough to force remedial work.

    020 3092 8551

    Quoted per plot

    one project quote

    24hr

    Typical certificate turnaround

    4.9/5

    From 100+ reviews

    10 yrs

    EPC validity once lodged

    Reviewed by Awais Sarwar, MSc, accredited energy assessor and owner of Team EPCLast reviewed

    Standard

    Part L 2021

    England, current edition

    Dwelling method

    SAP 10

    Design stage and as built

    Non-domestic method

    SBEM

    Design stage and as built

    EPCs

    One per plot

    Generated from the as-built calculation

    Contract planner

    Plan a developer part l package instruction

    Set the size of the job and send it over. We review the address list and confirm a per-plot rate in writing, usually the same day.

    Reviewed pricing

    From £28 per EPC

    From £28 per residential EPC, subject to review and a confirmed quote. 25 residential plots.

    No rate is approved until we've reviewed the list.

    020 3092 8551

    Nothing is booked and nothing is charged until you approve a written quote.

    What you get

    Everything included, nothing subcontracted.

    What is covered as standard on every developer part l package we carry out.

    Design stage first

    Calculations run before the specification is fixed, when changes are still free.

    One consultant

    SAP, SBEM, air tightness coordination and EPCs from the same team.

    Sign-off ready

    The evidence pack building control expects, in the format they expect it.

    Per-plot EPCs

    Every completed plot certificated and lodged ready for handover.

    What Part L 2021 actually requires

    Part L of the Building Regulations, in its 2021 edition, tightened both the target emission rate and the primary energy target and introduced a target fabric energy efficiency requirement for dwellings. In practice compliance is demonstrated twice: once at design stage, using SAP 10 for dwellings or SBEM for non-domestic buildings, to show the intended specification passes; and again as built, using the same method with the actual construction, products, services and measured air tightness result. The as-built calculation is what building control signs off, and the EPC for each plot is generated from it. If the two calculations diverge because the specification changed on site, the as-built one governs — which is why late-discovered substitutions are expensive.

    • Design-stage SAP (dwellings) or SBEM (non-domestic) calculations
    • Target emission, primary energy and fabric efficiency targets checked
    • Air tightness testing coordinated and the result fed into the model
    • As-built calculations reflecting the real construction
    • EPC lodged for every completed plot
    • Compliance pack assembled for building control

    Where developers lose money on Part L

    Almost always the same way: calculations commissioned too late. Once foundations are in and windows are ordered, the cheap routes to compliance — glazing specification, heating strategy, insulation thickness, orientation of glazing — are closed, and what remains is expensive retrofit: better units, additional insulation, sometimes mechanical ventilation nobody budgeted for. Run at design stage, the same target is usually met by choosing a different product at the same price. The second loss is the air tightness test being treated as a formality: a failed test on a completed plot means investigation, sealing, retest and delay, whereas the same detail flagged during the first plot costs nothing to fix across the rest of the site.

    How we run a site

    For a multi-plot site we model the plot types rather than every unit, agree the compliant specification with your design team, and then track changes as procurement happens so nothing quietly falls out of compliance. Air tightness testing is coordinated on a first-plot-then-sample basis, with the first test early enough to correct details across the site. As-built calculations and EPCs are then produced plot by plot as they complete, so handovers are not held up waiting for a batch. You get one consultant who knows the site, not a call centre and a queue.

    Mixed-use and non-domestic space

    Sites with commercial ground floors, communal plant, or shared circulation need both methods: SAP for the dwellings and SBEM for the non-domestic parts, with the boundary between them agreed properly rather than assumed. Communal heating, heat networks and shared ventilation are exactly where compliance modelling goes wrong, because the software's default assumptions rarely match what is being installed. We model what is actually specified and tell you when the specification will not achieve the target, early enough for it to matter.

    What it costs

    Pricing is per plot type and per plot, so a site with four house types and forty units costs far less per unit than forty individual instructions. Design-stage and as-built calculations are quoted together with the per-plot EPCs, air tightness testing is priced on the number of tests required, and SBEM for non-domestic space is priced on floor area and zones. Everything is quoted in writing against your drawings and plot schedule. Fire strategy and fire risk assessment work at completion can be added through our sister brand Fire Risk Specialists under the same instruction.

    Scope and price

    What it costs and how it runs.

    Indicative bands, confirmed as a fixed price before we book anything in.

    Indicative prices

    PropertyTypical scopePrice from
    Single plotDesign stage and as-built SAP plus EPCQuoted per plot
    Multi-plot siteSAP by plot type, then per-plot EPCsFalls with plot count
    Non-domestic spaceSBEM design stage and as builtQuoted on area and zones
    Air tightnessTesting coordination and result inputQuoted per test
    Bands only — every building is priced on floors, units and complexity.

    From enquiry to report

    1. Drawings receivedDay 1

      Plans, elevations, plot schedule and the intended specification.

    2. Design-stage calculations3-5 days

      Modelled by plot type with pass or fail reported and options where it fails.

    3. Specification agreedWeek 2

      The cheapest compliant route confirmed with your design team.

    4. Air tightnessOn programme

      First-plot test coordinated early enough to correct details site-wide.

    5. As built and EPCsPer completion

      As-built calculations and per-plot EPCs issued as units complete.

    The difference

    Us versus a typical assessment.

    Plenty of certificates are produced in a rush, with no advice attached and an agency markup on top. Here is how we differ.
    Comparison between Team EPC and a typical commodity provider for Developer Part L package
    AspectTeam EPCTypical assessment
    When we get involvedDesign stage, while changes are freeAs built, when they are not
    Air tightnessFirst plot early, details fixed site-wideTested at the end, failures remediated
    Multi-plot pricingBy plot type, then per plotPriced as individual jobs
    HandoverEPCs issued plot by plot as they completeBatched at the end, delaying sales

    How it works

    From enquiry to compliant.

    1. 01

      Quote

      Priced in minutes, online or over the phone.

    2. 02

      Book

      Survey slots within days, same-day and next-day available.

    3. 03

      Survey

      A registered energy assessor attends and surveys in person.

    4. 04

      Certificate

      Your EPC is lodged on the register, typically within 24 hours.

    Trusted by the teams we work for across London

    Audi
    Kia
    Car Giant
    GB News
    Budgens
    Pepe's Piri Piri
    Chicking
    Chaiwalla
    Zoomo
    Northwood
    Audi
    Kia
    Car Giant
    GB News
    Budgens
    Pepe's Piri Piri
    Chicking
    Chaiwalla
    Zoomo
    Northwood

    Frequently asked questions

    More from us

    Related services.

    Areas we cover

    London-based and covering London, Hertfordshire, Middlesex and Berkshire.

    Book your developer part l package from Quoted per plot.

    Tell us about the property and you will see a price in under a minute. Qualified registered assessors, certificate lodged typically within 24 hours of the survey.
    020 3092 8551

    No obligation. We answer the same day.

    4.9100+ reviews1,000+ EPCs completedRated 4.9 out of 5 from more than 100 reviews. More than 1,000 EPCs completed by registered energy assessors.

    Call
    Last word

    Ready when you are.

    Quote in 60 seconds. Assessor on site this week. Compliant report in your inbox within 24 hours. That's the whole process.

    020 3092 8551
    Transparent pricing No obligation 1,000+ EPCs completed 100% compliance guarantee
    Awais Sarwar
    — Awais Sarwar, MSc
    MD · 4.9 Google
    4.9
    ·1,000+ EPCs completed·100+ reviews
    Call