Portfolio EPCs · Wembley, London

    Pinnacle Tower, Wembley — bulk EPCs

    A high-rise residential development on our doorstep in Wembley, needing EPCs for every apartment before units were released to buyers and tenants.

    Awais Sarwar, Team EPC founder

    Awais & the Team EPC assessors

    London-based. Clear answers. Direct contact.

    4.9/5100+ reviews1,000+ EPCs completedRated 4.9 out of 5 from more than 100 reviews. More than 1,000 EPCs completed by registered energy assessors.

    • Registered energy assessors
    • Typical 24hr turnaround
    • £5M insured
    • 10+ years’ experience
    • Established 2014
    Awais Sarwar enjoying cricket in a London park

    Your assessor, personally accountable

    Awais Sarwar, MSc — Accredited Energy Assessor

    Awais is an accredited domestic and commercial energy assessor and the owner of Team EPC. He has surveyed and lodged EPCs across flats, houses, HMOs, managed portfolios and commercial premises throughout London and the Home Counties, and is currently studying an MSc in philosophy alongside running the business.

    EPC Register
    Accredited assessor
    MSc
    Built environment
    MSc Philosophy
    Currently studying
    10+ years
    London property
    Fire Risk Specialists
    Sister brand, same owner

    Off the clock: cricket, family time, an MSc in philosophy in progress and finding London's best food.

    Awais Sarwar, accredited energy assessor

    Awais Sarwar

    Founder · Accredited energy assessor

    About Awais
    Modern residential tower of the type assessed at Pinnacle Tower in Wembley, clad in dark glazing with scaffolding to one elevation
    Tower
    1

    Tower

    Apartment EPCs
    Bulk

    Apartment EPCs

    Lodging per batch
    24hr

    Lodging per batch

    The challenge

    New-build apartment blocks release units in phases, and each certificate has to be on the register before a flat can be marketed, let or completed on. Assessing dozens of similar-but-not-identical apartments one enquiry at a time would have held the release programme up.

    What we did

    We surveyed the tower floor by floor rather than flat by flat, grouping apartments by type so repeated layouts were assessed consistently. One coordinator held the schedule, site access was arranged with the on-site team in blocks, and every certificate was checked before lodging.

    The outcome

    Certificates were lodged on the national EPC Register in batches as each block of floors completed, with a single consolidated invoice and a clear record of which unit held which rating.

    Last word

    Ready when you are.

    Quote in 60 seconds. Assessor on site this week. Compliant report in your inbox within 24 hours. That's the whole process.

    020 3092 8551
    Transparent pricing No obligation 1,000+ EPCs completed 100% compliance guarantee
    Awais Sarwar
    — Awais Sarwar, MSc
    MD · 4.9 Google
    4.9
    ·1,000+ EPCs completed·100+ reviews
    Call